PE Release Preparation

Related: Takeoffs FE to PE Release (checklist and procedure)

Use this page as a prep outline; the authoritative pre-release requirements and step-by-step SOP live on FE to PE Release.

Material Checks

Picking Up Redlines

  • Apply architect redlines to shop drawings.
  • Final set becomes “For Record” sent back to architect.

Finalizing Shop Drawings

Creating PE File

Released in Epicor

  • Confirm job release, SC upload (UD40 / UD37 for CMG), and job-level fields per FE to PE Release before notifying the team.

Notify PE Team

Next Steps

See Also